I'm currently in the process of getting my throttle linkages fabbed up. I found a good place to mount everything i just need to make the link between the ball on the P-pump arm and current VP linkage. My idea was to weld a ball onto the VP linkage and fabricate a rod to connect from there to the ball on p-pump. I had a picture but apparently it didn't save. Doh!