Future Steel Machine Sheds Do You Like them or Hate them?
#11
#12
#13
If you haven't started please follow my advice.By piece by piece I mean assemble 1/2 a section at a time and get it bolted down first then bring the 2nd half up and bolt it together.Otherwise if you do it as 1 piece its unsafe as I had a bad experience long story but the end its easier to assemble it 1/2 a section at a time.Hope it helps.
#15
Well it costs about $10,000 to spray on foam insulate the building.So dad said the hell with it.Right now we heat the shop with a wood burning furnace and it keeps it above 50 in there so its not terrible.