edge jwa
I'm probably picking it up next month and I'm just curious how long should it take to put in? I figure the longest part will be running wire to the monitor in the cab or tapping the pump?
You should be done in 2 hours, including installing the pyro. I suggest the use of a stealth plate as well. Cleaner, and I think it makes a much better connection to the pump.
https://www.dieselbombers.com/5-9l-2...e-install.html
https://www.dieselbombers.com/5-9l-2...e-install.html
i installed mine in less then an hour, but the hole was already drilled for the pyro, and i don't have a gauge for the pump.




