stage 1 24 valve build up!
#1
stage 1 24 valve build up!
stage 1. 181/210 bigstick camshaft,110# valve springs,cromolly pushrods,S/O pump to replace my H/O,tunnel ram,water meth, valve job, port&polish head.
turbo & exaust manifold off
super B special. LOVE THAT TURBO!
just getting warmed up!
valve train off
waiting on parts
sent the ADR to get the 4K tunes and i put the revo software on the smarty!
cleaned&painted block. injection pump gear was a pain in the A$$ to take off
surprized how clean the pistons looked
cleain it up a little
got the head back from port&polish now its off to the machine shop getting new valves etc etc.
the guy who ported the head said that cyl#1,5,6 were extremely restictive. he opened them up real nice! that specials gonna spool so fast now!
my old 3250 dual disc! dont sled pull with a street clutch
still waiting on alot of parts will kep posting pictures as i start to put it back together. enjoy!
turbo & exaust manifold off
super B special. LOVE THAT TURBO!
just getting warmed up!
valve train off
waiting on parts
sent the ADR to get the 4K tunes and i put the revo software on the smarty!
cleaned&painted block. injection pump gear was a pain in the A$$ to take off
surprized how clean the pistons looked
cleain it up a little
got the head back from port&polish now its off to the machine shop getting new valves etc etc.
the guy who ported the head said that cyl#1,5,6 were extremely restictive. he opened them up real nice! that specials gonna spool so fast now!
my old 3250 dual disc! dont sled pull with a street clutch
still waiting on alot of parts will kep posting pictures as i start to put it back together. enjoy!
Last edited by LawnScum; 05-27-2010 at 08:06 PM. Reason: Automerged Doublepost
#10