The Bomb Shelter Take Cover ! All Off Topic Discussions , Anything And Everything Not Diesel Related Absolutely No Politics or Religion

who knows phases and power?

Thread Tools
 
Search this Thread
 
Old Sep 19, 2010 | 02:04 PM
  #1  
big bad diesel 416's Avatar
Thread Starter
|
Site Sponsor
Joined: Apr 2009
Posts: 3,719
Likes: 636
From: Lexington SC
Default who knows phases and power?

so I bought a mill............

Extra-large worktable.
Hinged belt cover allows fast speed changing.
Type: Combined Drill & Milling Machines Bench Type
Table Size & Travel: 28-3/4 x 8-1/4", 7"
Motor: 2 HP, 220V, 3Ph
Head: N/A
Spindle Taper: R8
1- 1/2 Albrecht keyless chuck
10- R8 collets with rack (1/8,3/16,1/4,5/16,3/8,7/16,9/16,1/2,5/8,3/4)
1-hold down set
1-6" slide clamp mill vise
1-Mill stand (model #26661052)
1-Mill/Drill combination machine (model # 26660630)
1-can of touch up paint
1-manual


my place to put it is only 220 single phase so I am going to get one of these

Anderson Phase Converters

or is there a cheaper/better way I was thinking the 10HP inverter because I have a large 4hp 3 phase compressor and looking at a 3 phase lathe

Ideas?
 
Reply
Old Sep 19, 2010 | 02:28 PM
  #2  
RedRammer's Avatar
Diesel Enthusiast
Joined: Mar 2007
Posts: 287
Likes: 17
From: Ponoka, Alberta... C
Default

I would look a phase converting VFD like the Toshiba VF series. These take up a lot less shop space and have become very reliable. We use drives like these on our single phase compressor locations to power instrument air compressor and glycol pumps both of which are very important to the process so reliable must be used. As well they should be price comparable.
 
Reply
Old Sep 19, 2010 | 03:47 PM
  #3  
wildbill's Avatar
BOMBARDIER
Joined: Jul 2007
Posts: 12,809
Likes: 668
From: Billlings, MT
Default

Be using A LOT of power to run it. Then again, having 3 phase wired into your shop won't be cheap either.
 
Reply
Old Sep 19, 2010 | 04:00 PM
  #4  
Mingle's Avatar
Site Sponsor - Mingle Graphics
Joined: Jul 2009
Posts: 462
Likes: 32
From: Marion, NC
Default

If you're going to start upgrading your shop with a lot of these machines, your best bet would be to look into getting 3 phase service ran to your shop.

Constantly buying and hooking up converters every time you get a new machine and exceed the rating of your current converter would probably equal up the start up cost of getting 3 phase service.
 
Reply
Old Sep 19, 2010 | 04:42 PM
  #5  
big bad diesel 416's Avatar
Thread Starter
|
Site Sponsor
Joined: Apr 2009
Posts: 3,719
Likes: 636
From: Lexington SC
Default

hmmm dont know what it will cost me to have it hooked up but I am sure it will cost me a leg, arm, and first born
 
Reply
Old Sep 19, 2010 | 04:51 PM
  #6  
Mingle's Avatar
Site Sponsor - Mingle Graphics
Joined: Jul 2009
Posts: 462
Likes: 32
From: Marion, NC
Default

If I was you I'd give my utility company a call Monday and just see what it would cost.. might be easier to plan that way if you know the cost of both options.
 
Reply
Old Sep 19, 2010 | 04:58 PM
  #7  
wildbill's Avatar
BOMBARDIER
Joined: Jul 2007
Posts: 12,809
Likes: 668
From: Billlings, MT
Default

Three-phase electric power - Wikipedia, the free encyclopedia
 
Reply
Old Sep 19, 2010 | 05:04 PM
  #8  
Mingle's Avatar
Site Sponsor - Mingle Graphics
Joined: Jul 2009
Posts: 462
Likes: 32
From: Marion, NC
Default

Three phase is amazing... as well as complex to wrap your head around sometimes...

Depending on where your shop is.. upgrading shouldn't cost too much more then a converter from what I've read.
 
Reply
Old Sep 19, 2010 | 05:26 PM
  #9  
wildbill's Avatar
BOMBARDIER
Joined: Jul 2007
Posts: 12,809
Likes: 668
From: Billlings, MT
Default

If your shop is in or near a commercial or industrial zone, 3 phase should be next to ya. Otherwise, it's gonna cost.
 
Reply
Old Sep 19, 2010 | 05:33 PM
  #10  
Mingle's Avatar
Site Sponsor - Mingle Graphics
Joined: Jul 2009
Posts: 462
Likes: 32
From: Marion, NC
Default

Even if he's not in a commercial or industrial zone... all it takes is a transformer bank and one more wire ran into the building.

Depends on how they do it... he can either get a 240Y/139 service.. 208Y/120 service.. or 240/120 high leg delta
 

Last edited by Mingle; Sep 19, 2010 at 05:38 PM.
Reply



All times are GMT -5. The time now is 09:24 AM.