Diesel Bombers

Diesel Bombers (https://www.dieselbombers.com/)
-   24 Valve 2nd Gen Dodge Cummins 98.5-02 (https://www.dieselbombers.com/24-valve-2nd-gen-dodge-cummins-98-5-02/)
-   -   VP replacement, I DID IT!!! (https://www.dieselbombers.com/24-valve-2nd-gen-dodge-cummins-98-5-02/53825-vp-replacement-i-did.html)

Billy D 07-05-2010 11:18 AM

VP replacement, I DID IT!!!
 
I didi it! I swapped out my VP! No problems what so ever, I watched the Diesel Dan videos, and wham-o! I did almost ferget to replace my Cam sensor, but I relized it before it was too late. Anyone questioning whether they can do it or not, YOU CAN! Don't sike yourself out like I did. I started at 6:30 am, and got done about 12:30PM. :jump: Yeah I know, i'm a rookie, i'm quite proud of Billy D:rocking:

DB Admin 07-05-2010 11:55 AM

congrats !

Diesel Dawgs Performance 07-05-2010 11:58 AM

:rocking:

outlaw1_gt 07-05-2010 12:06 PM

Nice job I'll be doin mine soon :tu:

00' Quad Cab 07-05-2010 02:19 PM

Looks intimidating at first, but just knuckle done and do it.

Gives you a good feeling of accomplishment when you do it yourself, and you have a better understanding of your engine.

Congrats.:c:

RAW 07-05-2010 07:57 PM

Thats great to hear! I like to offer those videos to everyone looking to change their own VP44. They are just damn good!

SaltwateR.CowboY 07-05-2010 08:21 PM

I seen the video on another forum thread too. Walked me thru it very nicely and straightforward. I will be attempting it in the near future as well! :tu:

crzycummins 07-05-2010 08:28 PM

:tu::tu::tu:

01greenmachine 07-06-2010 07:29 PM

:c::tu:

thebullet83 07-07-2010 06:12 AM

nice job man. and six hours or so is a great job for a first timer!

AF1CUMMINS 07-07-2010 10:22 AM


Originally Posted by Billy D (Post 584366)
I didi it! I swapped out my VP! No problems what so ever, I watched the Diesel Dan videos, and wham-o! I did almost ferget to replace my Cam sensor, but I relized it before it was too late. Anyone questioning whether they can do it or not, YOU CAN! Don't sike yourself out like I did. I started at 6:30 am, and got done about 12:30PM. :jump: Yeah I know, i'm a rookie, i'm quite proud of Billy D:rocking:

^^ x2

Billy D 07-07-2010 01:18 PM


Originally Posted by thebullet83 (Post 585624)
nice job man. and six hours or so is a great job for a first timer!

My mistake, I didn't want to mislead anyone, it was 18 hours:s: i wish it would of taken 6 :lol: I know dam rookies:c:

AF1CUMMINS 07-07-2010 01:41 PM

ooooooooooooooooooooooooh, well that sucks, sorry to hear it took so long.

JIT 07-07-2010 04:07 PM

Congrats... good thing you werent getting paid by the hour! LOL

I replaced mine with a P-pump!!!

bwskweeker 07-08-2010 01:23 AM

Congrats! I used them same videos to do mine. Dont git much easier than that

coyropin 07-08-2010 08:23 AM

good job, yeah 18 is alittle ruff but for first time not to bad. plus it started:rocking:

chpmnsws6 07-10-2010 02:39 AM

Thats actually flying right along in my world. Even after 3-4 pump replacements, its still a good two day job!


All times are GMT -5. The time now is 05:49 AM.


© 2024 MH Sub I, LLC dba Internet Brands