Construction Equipment Discussion of Diesels Used for Construction - Bull Dozer's , Back Hoes , Skid Steers , Track Hoes , Dump Trucks

Construction Delay With Some Lost Equipment

Thread Tools
 
Search this Thread
 
Old Sep 5, 2007 | 07:55 PM
  #21  
06 DIESEL's Avatar
Thread Starter
|
Diesel Bomber
Joined: Mar 2007
Posts: 1,551
Likes: 118
From: Kingsville, MD
Default

Originally Posted by Whitmore



.......................................
 
Reply
Old Sep 11, 2007 | 02:11 AM
  #22  
LOGANSTANFORTH's Avatar
Diesel Bomber
Joined: Aug 2007
Posts: 6,157
Likes: 371
From: TIKRIT, IRAQ
Default

mind you these are the same people that built a resort on man made islands in the shape of a giant palm tree. this act of engineering over achievement seems about right.
 
Reply
Old Sep 11, 2007 | 10:41 AM
  #23  
Babyfat's Avatar
Diesel Enthusiast
Joined: Mar 2007
Posts: 145
Likes: 5
From: Grass Lake, MI
Default

at least the hook is out of the water
 
Reply
Old Sep 11, 2007 | 11:20 PM
  #24  
shortmansyndrome's Avatar
Diesel Enthusiast
Joined: Mar 2007
Posts: 396
Likes: 12
From: Stillwater, MN
Default

i dont think thats what the boss had in mind when he said " make sure you give it a bath before you bring it back"
 
Reply
Old Sep 13, 2007 | 05:20 PM
  #25  
Bosshogg's Avatar
Diesel Enthusiast
Joined: Mar 2007
Posts: 495
Likes: 26
From: Eaton, OH
Default

For some odd reason I dont think the pump in the second pic is going to keep up here
"give:

Lets go FISHIN!!!!
 
Reply
Old Sep 13, 2007 | 07:20 PM
  #26  
Racer9's Avatar
Diesel Bomber
Joined: Mar 2007
Posts: 1,826
Likes: 339
From: Erie Pa
Default

I'm declaring it a photoshop fake!:bs: In the first pic background theres a bridge with flags along it, and no new buildings. In all the other pics theres lots of new construction.
 
Reply
Old Sep 13, 2007 | 07:28 PM
  #27  
06 DIESEL's Avatar
Thread Starter
|
Diesel Bomber
Joined: Mar 2007
Posts: 1,551
Likes: 118
From: Kingsville, MD
Default

Originally Posted by Racer9
I'm declaring it a photoshop fake!:bs: In the first pic background theres a bridge with flags along it, and no new buildings. In all the other pics theres lots of new construction.
If you look at all of the pictures they all have a different background. This is because they are taken from different angles. You can tell this by where the crane is in all of the pictures. Sorry but I see your BS I raise you an answer.
 
Reply
Old Sep 14, 2007 | 06:14 PM
  #28  
Racer9's Avatar
Diesel Bomber
Joined: Mar 2007
Posts: 1,826
Likes: 339
From: Erie Pa
Default

Originally Posted by 06 DIESEL
If you look at all of the pictures they all have a different background. This is because they are taken from different angles. You can tell this by where the crane is in all of the pictures. Sorry but I see your BS I raise you an answer.
Sorry, it's a fake! Look again, you see the crane in the water from almost the same angle, just slightly to the left of the original pic. Yet in the far right of the original pic theres no buildings seen over the top of the wall, just the flag bridge. In the water picName:  fish.gif
Views: 26
Size:  1.0 KB, theres new buildings all the way to the left, which should be visible in the original pic.
I'll match that, and call ya!Name:  boxing.gif
Views: 38
Size:  5.1 KB
 
Reply
Old Sep 14, 2007 | 09:43 PM
  #29  
shortmansyndrome's Avatar
Diesel Enthusiast
Joined: Mar 2007
Posts: 396
Likes: 12
From: Stillwater, MN
Default

I'm going to have to dissagree with you Racer9 and agree with 06 Diesel. In the first pic you can see the white trailers off to the left behind the crane and not see where the wall breaks off to the right. Then in the last pic the white trailers are gone and you are looking strait ahead to where the wall broke.

I'm in.

Sorry the plain smiley face it's the only one I know how to use.
 
Reply
Old Sep 15, 2007 | 10:34 PM
  #30  
Racer9's Avatar
Diesel Bomber
Joined: Mar 2007
Posts: 1,826
Likes: 339
From: Erie Pa
Default

Originally Posted by shortmansyndrome
I'm going to have to dissagree with you Racer9 and agree with 06 Diesel. In the first pic you can see the white trailers off to the left behind the crane and not see where the wall breaks off to the right. Then in the last pic the white trailers are gone and you are looking strait ahead to where the wall broke.

I'm in.

Sorry the plain smiley face it's the only one I know how to use.
OK, but you still should see some of that new construction in the first pic, before the dam broke.

To use other smileys, look to the right of the page where you type your reply, and jus click on the one you want

---AutoMerged DoublePost---

Originally Posted by shortmansyndrome
I'm going to have to dissagree with you Racer9 and agree with 06 Diesel. In the first pic you can see the white trailers off to the left behind the crane and not see where the wall breaks off to the right. Then in the last pic the white trailers are gone and you are looking strait ahead to where the wall broke.

I'm in.

Sorry the plain smiley face it's the only one I know how to use.
OK, but you still should see some of that new construction in the first pic, before the dam broke.

To use other smileys, look to the right of the page where you type your reply, and jus click on the one you want
Use the "post reply" button, instead of the "quick reply"
 

Last edited by Racer9; Sep 15, 2007 at 10:34 PM. Reason: Automerged Doublepost
Reply



All times are GMT -5. The time now is 01:55 PM.