![]() |
| ![]() |
| Bomb Site | Regional & Clubs | Reviews | Shop Bombers | Classifieds | Directory | Casino & Board Games [0] | Arcade |
|
|||||||
| 5.9L CR Bombs (Aftermarket) Discussion of 5.9 Liter Dodge Cummins Diesels with Common Rail Injection Related To Performance And Longevity |
Got the new stacks in late thursday from Up Country Fab. (THANKS GUYS!) The billet clamps by Black Out Diesel Performance (THANKS MILT!) were completed late Friday night and we went to installing them today. Still have to tape everything off and paint them again. ... JOIN NOW TO REMOVE TRACER
![]() |
|
|
LinkBack | Thread Tools |
|
#1
|
||||||
|
||||||
|
Got the new stacks in late thursday from Up Country Fab. (THANKS GUYS!)
The billet clamps by Black Out Diesel Performance (THANKS MILT!) were completed late Friday night and we went to installing them today. Still have to tape everything off and paint them again. The darn things are so big it was really tough not scratchin them. Moving in the "goal" posts was kind of a you know what too. It looks good Also thanks to FTE Diesel for all the help! (THANKS WALLY!) ![]() ![]() ![]() ![]() ![]()
|
|
#5
|
||||||
|
||||||
|
No doubt you have some big ones there Buddy. Very nice job
|
|
#6
|
||||||
|
||||||
|
I used to think that if you couldn't put your fist in the pipe it was a waste of time to change out. I guess I'll have to change my criteria... if you can't stick your head in the pipe it's not worth changing out.
Those things are HUGE!!! |
|
#7
|
||||||
|
||||||
|
thinking of having a contest at the Dyno day to see how far someone can shove their head inside them! would be worth kicking in $100 for the prize!
|
![]() |
| Thread Tools | |
|
|
| Copyright And Legal Notice | Links Of Interest |
|
Powered by vBulletin® Version 3.8.5 |
|